Case Study:

Bespoke ECO House Groundworks

Project Location

Kilmacolm

Client

Private Client

Timeline

2019 – 2021 (suspended during COVID-19)

Project Overview

Our client commissioned us to undertake all groundworks, foundations and drainage for their bespoke ECO house kit design on a challenging sloped site in Kilmacolm. The project required extensive rock cutting to reduce formation levels and create suitable gradients for drainage and service connections. Precise setting out was critical to meet the exact specifications required by the ECO house system, including a reinforced concrete slab foundation, integrated service runs, and specialist excavations for heat pump and plant room installations. The scope also included a double garage with carport, main service connections, external pathways and driveway construction.

Main Contractor Expertise

Managing your entire project from planning through to completion, coordinating all trades for seamless delivery and consistent quality throughout.

Four Generations of Skill

Over 100 years of building knowledge passed down through the Smith family, ensuring traditional craftsmanship meets modern standards on every project.

Trusted Local Service

Building lasting relationships across Ayrshire and Renfrewshire through reliable communication, honest advice and dependable workmanship since 1923.

Our Approach

The challenging site conditions required careful planning and execution from the outset. Extensive rock cutting was necessary to reduce formation levels whilst ensuring compliant gradients to the surrounding road and service connections. We worked closely with the ECO house specifications, ensuring every dimension and setting out requirement was fully met and independently checked before the kit was delivered to site. Additional rock cutting was carried out to create the deepened areas required for the heat pump and plant room beneath the reinforced concrete slab. Despite suspension during COVID-19 restrictions, we successfully restarted and completed all groundworks, main service and sewer connections, double garage construction with carport, and external pathways and driveway once the ECO house build was complete.

Achievements

Despite the challenges of difficult ground conditions and COVID-19 delays, we successfully delivered all groundworks to the exact specifications required for this innovative ECO house project. The precision required in setting out and the technical demands of integrating modern sustainable systems with traditional groundworks demonstrated our ability to adapt our skills to contemporary building methods. The completed groundworks provided the perfect foundation for the ECO house kit, with all drainage, services and external works seamlessly integrated. Our client appreciated our meticulous approach to meeting the strict specifications and our professional management of the project through unexpected delays, resulting in a sustainable home built on solid, expertly prepared foundations.

Other Case Studies